Site Preparation and Grading
Site Preparation and Grading in Waco
Before any concrete gets poured, the ground has to be shaped, sloped, and compacted to the grading plan. Art-deco strips topsoil, moves the bulk dirt with a dozer and excavator, and works the pad down to final grade with GPS grade control so pad elevations and drainage slopes match the engineer’s drawing. A typical Waco lot in an area like Castle Heights grades out in one to three days.
Why Grading Matters First
- Drainage. Positive slope away from the structure keeps water off the foundation, which matters on the expansive clay common across McLennan County.
- A stable pad. Fill placed and compacted in lifts to 95 percent of maximum dry density gives your slab a load bearing base that will not settle later.
- Schedule. Grading is the first stage, so getting it right and on time keeps every trade behind it moving.
Our Process
We call in the 811 utility locate, strip and stockpile topsoil, cut and fill to rough grade, then make a finish pass that sets the final surface and slopes. We compact as we go, dress the site, and leave silt fence in place where stormwater rules require it. You get a written completion date before the first machine rolls in.
Call (254) 320-8137 for a free site visit and a grading estimate in Waco.